Frequently asked questions relating to contract logistics, build timelines, and material sourcing in Sarawak.
Absolutely. We provide an end-to-end framework. Our certified internal architectural and
engineering teams manage all conceptual blueprints, mechanical drawings, and submit them
directly to the relevant local municipal councils ensuring totally compliant structural
authorization.
Turnkey signifies a complete, integrated contract where we handle strictly everything. From
zero-phase design, council logistics, ground-up construction, to internal finishings. You
simply "turn the key" and walk into a finalized, ready-to-live-in architectural space.
For standard single to double-layer residential developments within normal geographical
confines in Sarawak, core construction takes 6-9 months following schematic sign-off and
council approval. Variable factors like rain schedules and custom structural finishes can
slightly shift this timeline.
We operate on isolated fixed-cost contracts. Before breaking ground, a master Bill of
Quantities (BQ) is engineered. Unless you explicitly issue a Variation Order (VO) to upgrade
materials or expand the floor plan conceptually, the quoted price strictly remains the
finished price.
Yes. If you have already engaged an external architect and possessed approved schematics,
our engineering division will operate merely as the primary build contractor directly
executing those schematics under strict adherence to structural safety codes.