Financial Parameters
Fee Structures.
CURRENCY: MYR (RM)
EFFECTIVE: FY 2026
EFFECTIVE: FY 2026
TIER 01
Standard Build.
RM 130
/ SQFT (STARTING)
- Structural Eng.Included
- Standard FinshesIncluded
- Arch. DesignBasic
TIER 02
Premium Custom.
RM 180
/ SQFT (AVERAGE)
- Structural Eng.Included
- Premium FinishesIncluded
- Arch. DesignBespoke
- Smart IntegrationIncluded
TIER 03
Luxury Estate.
RM 250+
/ SQFT (VARIABLE)
- Structural Eng.Complex
- Imported FinishesIncluded
- Arch. DesignAvant-Garde
Disclosure: These metrics serve as a baseline framework. Exact financial parameters are strictly tied to specific site topography, material indices at the time of procurement, and the complex nature of the requested architectural geometry. A formalized Bill of Quantities (BQ) will be supplied post-discovery phase.